spacer image
industrial storage solutions

industrial storage solutions

Site Conditions

Construction

Our structures can be built on a variety of ground surfaces including tarmac, grass, concrete, stone, gravel, paved or brick areas. They do not need any foundations, and keep the cost of preparation low. While remaining very strong and robust, the hard-sided structures are fabricated from aluminium, and remain lightweight and can often be erected in areas where access restrictions apply and where the use of heavy plant equipment is not suitable. Our structures can be built extremely quickly and often without the need for forklift trucks.

Span

We can build structures to a span to meet your specifications, joining a number of individual structures together if necessary.

Erection

We can typically build a structure with 48 hours of receipt of order, dependant upon labour and stock availability.

Anchorage

We use various methods to anchor the structure, depending on the type of structure, its use, weather conditions and the ground it is being built upon.

These methods include 900mm steel fixing stakes, expansion raw bolts, or weights where the ground cannot be drilled.

A Reputation Built on Excellence

GL events Snowdens | Second Drove | Eastern Industry | Fengate | Peterborough | PE1 5XA | England (UK)
Email info@snowdens.co.uk | Web www.snowdens.co.uk
Tel 01733 344110 | Fax 01733 314985

Site designed by Business Internet Ltd

Temporary Buildings  |  Temporary Storage Solutions  |  Marquee Hire
Temporary Cover Solutions  |  Temporary Storage Structures